Here is a review of the projects that I laid out for myself last January. My final results are in red.
Sewing Priorities for 2013
Deadlines:
Megan’s
quilt – Jan. 15 Done
Baby
quilt for Angie – March 15 Done
Baby
quilt for Nicola-shower August Done
WIP’s:
2012 Designer Mystery BOM Done-waiting to be quilted
Amish BOM Done-waiting to be quilted
Bee’s Bee All installments done. I don't think I will plan to join another bee. It was a good experience.
Table Runner – Swirling Leaves Done
Farmer’s Wife Done-waiting to be quilted
Blogger BOM – Purple/green Done-Quilted on domestic machine.
Star Struck – begun at Bonnie Hunter workshop Done. Gifted to my brother
Blogger BOM – Christmas – needs quilting Done. Quilted on domestic machine.
Merry, Merry Snowmen – needs quilting Done. Quilted by Natalia Bonner. Currently hanging on wall
Leader/Ender: Blue Ridge Beauty Done. Quilted by Missouri Star Quilting Company
2013 Designer Mystery BOM In progress
UFO’s: (Top priority to finish)
Pine Tree Wallhanging Done. Hanging on Master Bedroom Wall
Strawberry Marmalade quilt – needs quilting Still waiting to be quilted.
Pansy quilt – needs quilting Still waiting to be quilted.
Bear Hollow – make some repairs – needs quilting Still waiting to be quilted.
Ready to Go (have fabric/pattern):
Oakshott wallhanging Done Hanging on wall
Woven (Kissing Booth fabric) Done-waiting to be quilted
Great Granny Square QAL Done-waiting to be quilted
Row Along (w/Lori Holt) Currently working on this one. Begun January 2014
Hashtag quilt Done-waiting to be quilted
Jane's Baskets kit- In progress, Some cutting has been done
Small Projects:
Wine Carriers-Completed one as a gift, January 2013
Scissor holder- Completed Jan. 2013, gifted to Ginny
Coin purses
Sewing table organizer (Oh, Franson pattern)
Spray bottle cover (pattern from Lori Holt)
Pillows (Tula Pink pattern)
Purse
Sewing Tote (pattern on Moda Bake Shop)
Someday Wishlist:
Blogger Girl BOM
Holiday Lane Pillow
Reindeer - paper pieced pillow
LynneBob Square Pants quilt
Rainbow project
I think I accomplished a lot in 2013. Now it is time to think about my priorities for 2014.
My top priority for 2014 is going to be machine quilting all of the tops that have accumulated in my sewing room. As my followers know, I received an APQS Lucey quilting machine in August. I have been practicing and it is now time to put a real quilt on the machine.
Quilt tops waiting to be quilted 2014:
Strawberry Marmalade quilt
Pansy quilt
Bear Hollow
2012 Designer Mystery BOM
Amish With a Twist II
Farmer's Wife
2013 Designer Mystery BOM (when all installments are finished)
Woven quilt top (Kissing Booth fabric)
Great Granny Square quilt top
Lori Holt Row Along (when finished)
2013 Medallion wall hanging
Swoon quilt top
Under the Stars quilt top
I will also be working on several BOM projects:
2013 Designer Mystery BOM
Visa Versa BOM project
Park Bench BOM (Fat Quarter Shop)
I have also preordered a kit from Fig Tree Co. (The pear quilt)
That is how my year is looking right now. I will try not to be distracted by squirrels or bright shiny objects that will get me off track. However, as I have experienced in the past, some of those projects are not only fun, but also quite rewarding. I will try to stay on track.
Thanks for stopping by.
No comments:
Post a Comment